Skip Navigation
This table is used for column layout.
 
Planning Board Minutes 08/22/2007 ~ Site Walk - Elkins
 Town of Otisfield
Planning Board
Public Site Walk
August 22, 2007

Applicant Name: Ron & Fran Elkins, Map U01 Lot 009, (Saturday Pond)

Reasons for this site walk:     

Issue regarding:        
~ Reconstruction of a building within 100’ of the shoreline
~ 30% Expansion Determination
~ Greatest Practical Extent Determination

Falls under the responsibility of the Otisfield Planning Board
Addressed under Otisfield’s Shoreland Zoning Ordinance
Section 12 (NON-CONFORMANCE),
Letter C (Non-Conforming Structures)
Number 1 (Expansions)
Number 2 (Reconstruction or Replacement)

1.      Call to order: The Site Walk was called to order at 5:04 PM.

2.      Attendance:
PB Members present:
Chairman Rick Micklon
Vice Chair Stan Brett  
Dan Peaco
Maureen Howard  
Mike McAllister  
Shirley Hamilton, Alternate/Recording Secretary

Planning Board Secretary:  Tanya Taft
Code Enforcement Officer:  Richard St. John

3.      Introduction of Otisfield Board of Selectmen present at this meeting.

Hal Ferguson present -  Mark Cyr & Tom Nurmi, not in attendance
4.      Introduction of the applicants:    
Represented by Bob Harlow, Builder – Applicants are in Arizona.

5.      Introduction of any consultants attending on behalf of the Planning Board.
(Not in attendance at this time per the recommendation of the Board)

6.      Public Attendance:              Address                                 Abutter 
Bill Burkitt                    Saturday Pond Road                      Yes
Albert Sirois                   Rayville Road                           Neighbor
Penelope Peaco          Saturday Pond Road                      Neighbor
Gordon Peaco            Saturday Pond Road                      Yes

                                                
7.      Discussion & Comments:

Site-Walk was opened by RM.  Bob Harlow stated that it is 120 feet across the width of the road.   Septic is going to be located at the bottom of the stairs. It will be made of cement chambers. Location of septic will be 80’ from the water.  Driveway is a deeded ROW across the Burkitt property. Tree removal will be needed. Power will go underground. Applicant is looking to have the building set back an additional 30’ from water. Approx. 40 trees will be removed. CEO and RM explain the issues of how raising the structure, moving the structure, and leaving it where it sits, all affect the calculations for 30%. By moving the structure back the 30’ they get a full foundation. Approx. 1,480 sf. of living space. Currently the structure is approx. 58’ from the road, the closest corner is approx. 48’. High water mark was looked at. RM requesting CEO submits info. to DEP so that they can be involved at the start of this project. RM would like to work w/ them early on for guidance. Hal Ferguson: raised questions and concerns regarding tree cutting, and the 40% allowance over a 10-year period. RM: Peer review may be necessary for erosion, phosphorus, and tree removal.


8.      Adjournment:  6:30 PM



Respectfully submitted,
Tanya Taft, Secretary.
Approved by:
Rick Micklon, Chair
Otisfield Planning Board~
Approved on: 09/18/2007